Two new MRT lines being studied; West Coast MRT Extension to proceed
The investment is anticipated to go in the direction of condition monitoring systems to enable even more proactive and targeted repair, and new systems to enhance the efficiency and efficacy of rail maintenance. The investment will also assist to offer staff training programmes for rail workers.
In planning for the near future project of Singapore’s rail network, Chee also released the authorities’s intentions to invest up to $1 billion over the next 5 years to maintain high-reliability standards in both newer and older train units.
Among the recommended rail lines, Seletar Line, might offer locations consisting of Woodlands, Sembawang, Sengkang West, Serangoon North, Whampoa, Kallang, and the Greater Southern Waterfront.
Upon completion, the WCE is going to supply residents travelling from the West to the city center with up to 20 mins of time reductions.
Chee also released LTA’s plans to proceed with the West Coast Extension (WCE), which will prolong the Jurong Region Line (JRL) to attach with the Circle Line (CCL) and Cross Island Line (CRL).
The second, tentatively called the Tengah Line, can enhance the transport network in the west and northwest locations to offer locations such as Tengah, Bukit Batok, Queensway, and Bukit Merah.
Subject to the results of LTA’s workability researches, the Seletar Line and Tengah Line might be joined, according to a pep talk by Transport Minister Chee Hong Tat in parliament on March 5.
On the other hand, its 2nd step aims to prolong the JRL from West Coast Stop to connect with the CCL’s Kent Ridge Station by the early 2040s.
The WCE is going to be executed in two stages. The primary stage is assumed to stretch the JRL from Pandan Reservoir Terminal to attach with the CRL by the late 2030s.
“Jointly, these efforts to broaden the rail network, enhance the administration of rail assets, and upskill our rail workforce, will allow us to proceed delivering helpful, reliable and sturdy public transportation for our travelers,” says LTA.
Two brand-new MRT lines are at the moment undertaking feasibility studies by the Land Transport Authority. The lines are aimed for completion in the 2040s and can possibly serve more than 400,000 houses.
